Address
304 North Cardinal
St. Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
Address
304 North Cardinal
St. Dorchester Center, MA 02124
Work Hours
Monday to Friday: 7AM - 7PM
Weekend: 10AM - 5PM
₨4,200.00
Elastomeric joint sealant / adhesive
Sikaflex®-1A is a 1-part, polyurethane, coloured, moisture curing non-sag elastomeric sealant. Movement capability ±35 %. Internal and external use.
Sealing joints for:
Adhesive for:
~40 (after 21 days) | (ASTM C 661) |
~40 (after 28 days) | (ISO 868) |
~0,55 N/mm2 (80 psi) at 60 % elongation (23 °C) | (ISO 8339) |
~0,90 N/mm2 (131 psi) at 60 % elongation (−20 °C) |
25 % | ~35 psi (0,24 N/mm2) |
50 % | ~60 psi (0,41 N/mm2) |
100 % | ~85 psi (0,59 N/mm2) |
~90 % | (ISO 7389) |
Substrate | Peel Strength | Adhesion loss |
Concrete | ~20 lbs (~9 kg) | 0 % |
Aluminium | ~20 lbs (~9 kg) | 0 % |
Glass | ~20 lbs (~9 kg) | 0 % |
~55 lbs./in. (~10 N/ mm) | (ASTM D 624) |
±35 % | (ASTM C 719) |
±25 % | (ISO 9047) |
Resistant to many chemicals. Contact Sika Technical Services for additional information
0 (no cracks) | (ASTM C 793) |
−40 °F to +170 °F (−40 °C to +77 °C)
The joint dimensions must be designed to suit the movement capability of the sealant. The joint width must be ≥ 6,0 mm (¼ inch) and ≤ 40 mm (1 ½ inch). The joint depth must be ≥ 6,0 mm (¼ inch) and ≤ 12 mm (½ inch). For joints in facades a width to depth ratio of 2:1 must be maintained (for exceptions, see table below). For floor joints a width to depth ratio of 1:0.8 must be maintained. For use in horizontal joints in traffic areas, the absolute minimum depth of the sealant is 12 mm (½ inch).
Standard joint widths for joints between concrete facade elements:
Convert table below to imperial units if required.
Standard joint widths for joints between concrete facade elements:
Joint distance
m |
Min. joint width
mm |
Min. joint depth
mm |
2 | 10 | 10 |
4 | 15 | 10 |
6 | 20 | 10 |
8 | 28 | 14 |
10 | 35 | 17 |
The above information is for guidance only. All joints must be correctly designed and dimensioned in accordance with the relevant national standards and codes of practice before their construction. The basis for calculation of the necessary joint widths are the type of structure, dimensions, technical values of the adjacent building materials, joint sealing material and the specific exposure of the building and the joints.
Joint width
mm |
Joint depth
mm |
Joint length
m per sausage (600 ml) |
10 | 10 | 6 |
15 | 10 | 4 |
20 | 10 | 3 |
25 | 12 | 2 |
30 | 15 | 1,3 |
Joint width
mm |
Joint depth
mm |
Joint length
m per cartridge (300 ml) |
10 | 10 | 3 |
15 | 10 | 2 |
20 | 10 | 1,5 |
25 | 12 | 1 |
30 | 15 | 0,65 |
Joint width
inch |
Joint depth
inch |
Joint length
ft per sausage (20 fl.oz.) |
1/2 | 1/4 | 24,4 |
3/4 | 3/8 | 5,4 |
1 | 1/2 | 3 |
11/2 | 3/4 | 1,4 |
Joint width
inch |
Joint depth
inch |
Joint length
ft per cartridge (10 fl.oz.) |
1/2 | 1/4 | 12,2 |
3/4 | 3/8 | 5,4 |
1 | 1/2 | 3 |
11/2 | 3/4 | 1,4 |
Joint width
inch |
Joint depth
inch |
Joint length
ft per gallon |
1/2 | 1/4 | 154 |
3/4 | 3/8 | 68,4 |
1 | 1/2 | 38,5 |
11/2 | 3/4 | 17,1 |
Joint width
inches |
Joint depth
inches |
Joint length
ft per gallon |
1/4 | 1/4 | 308 |
3/8 | 1/4 | 205 |
3/8 | 3/8 | 137 |
1/2 | 1/4 | 154 |
1/2 | 3/8 | 102 |
1/2 | 1/2 | 77 |
3/4 | 1/4 | 103 |
3/4 | 3/8 | 68 |
3/4 | 1/2 | 51 |
1 | 1/2 | 39 |
11/4 | 1/2 | 31 |
11/2 | 1/2 | 26 |
Consumption depends on the roughness and absorbency of the substrate.
These figures are theoretical and do not allow for any additional material due to surface porosity, surface profile, variations in level or wastage etc.
Packaging | 10 fl. oz. cartridge, 12 cartridges per box 20 fl. oz. foil pack, 20 foil packs per box 5 gallon pail 55 gallon drum Refer to current price list for packaging variations |
---|---|
Colour | Colour range to be defined by local sales organisation. |
Sustainability / Certifications / Approvals | ENVIRONMENTAL INFORMATION |
Product Information | Chemical Base Shelf Life Pails and drums: 6 months from date of production Storage Conditions |
Application Information | Backing Material Ambient Air Temperature Substrate Temperature Skin Time (CQP 019-1) Tack Free Time |
Application Steps | SUBSTRATE PREPARATION Removal techniques such as wire brushing, grinding, grit blasting or other suitable mechanical tools can be used. Repair all damaged joint edges with suitable Sika repair products New or refurbished joints must be saw-cut. Where joints in substrate are saw cut. After sawing, all slurry material, must be flushed away and joint surfaces allowed to dry. All dust, loose and friable material must be completely removed from all surfaces before application of any activators, primers or sealant. Sikaflex®-1A adheres without primers and/or activators. For optimum adhesion, joint durability and critical, high performance applications such as joints on multi-storey buildings, highly stressed joints, extreme weather exposure or water immersion / exposure. The following priming and/or pre-treatment procedures must be followed: Non-porous substrates Before sealing, allow a waiting time of > 15 minutes (< 6 hours). Other metals, such as copper, brass and titanium-zinc, cleaned and pre-treat using Sika® Aktivator-205 applied with a clean cloth. After a waiting time of > 15 minutes (< 6 hours). Apply Sika® Primer-3 N applied by brush. Before sealing, allow a waiting time of > 30 minutes (< 8 hours) PVC has to be cleaned and pre-treated using Sika® Primer-215 applied with a brush. Before sealing, allow a waiting time of > 30 minutes (< 8 hours). Porous substrates Adhesion tests on project specific substrates must be performed and procedures agreed with all parties before full project application. Contact Sika Technical Services for additional information. Note: Primers and activators are adhesion promoters and not an alternative to improve poor preparation / cleaning of the joint surface. Primers also improve the long term adhesion performance of the sealed joint. If products mentioned above are not available in local country, replace with the appropriate local products. For green concrete applications control joints must be cut 8 hours prior to sealant installation. Expansion joint forms must be removed 4 hours prior to sealant installation. For wet concrete applications all excess or standing water must be displaced and concrete must then dry for a minimum of 60 minutes prior to sealant installation. Sikaflex-1a can be applied on green concrete after the concrete has cured for a minimum of 24 hours at +75 °F (+25 °C). MIXING CLEANING OF TOOLS For cleaning skin use Sika® Cleaning Wipes-100. |
Reviews
There are no reviews yet.